Building 2800, Renovation

The newly renovated modern building now reflects the technology savvy Corporation.

March 26, 2018

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

TE Connectivity, Fulling Mill Road Campus, Middletown, PA

The newly renovated modern building now reflects the technology savvy Corporation.

The interior and exterior workplace for 800 occupants of the main building on TE’s campus that was trapped in a 1970s time capsule. The newly renovated building now reflects a contemporary arrangement of interior glass front executive offices, which overlook multicolored standard workstations.

Numerous collaborative spaces have been introduced including: open kitchenettes with multiple types of seating, small to midsize breakout rooms with large glass whiteboards and access to large monitors for impromptu meetings. Informal gathering spaces were also designed where staff members can reconfigure soft seating, coffee tables, and ottomans into informal meeting spaces.

A new training center venue was designed consisting of several static training rooms and one large reconfigurable training room.

“Your renovations finally· catapulted our 1970’s building into the 21st century allowing employees to collaborate with their peers across campus and around the world.”

Tracy McHenry Construction Manager, TE Connectivity March 19, 2017