Emergency Department Expansion and Renovation – Community General Campus, PinnacleHealth System

An 11,000 gsf addition was developed for a new ambulance and walk-in entrance.

March 12, 2018

  • 1
  • 2
  • 3
  • 4

Harrisburg, PA

An 11,000 gsf addition was developed for a new ambulance and walk-in entrance. This multi phased project maintained existing operations throughout all construction phases.

The design included a new Walk -In Entrance with Waiting Room Registration and Triage. The Fast Track area included a central staff station serving 5 private exam rooms. The Cardiac/Trauma rooms are adjacent to the ambulance drop off area, consisting of 3 open treatment bays to provide flex space for multiple trauma patients simultaneously. The Emergent Care area has a centrally located staff station serving 7 treatment rooms allowing for flex space during peak hours. The observation area and holding bays were developed for patients awaiting diagnostic imaging pending either admissions to the hospital or discharge.


Comments are closed.