Cardiac Cath Lab Renovation – Heart of Lancaster Regional Medical Center

Murray Associates guided the transformation of the existing Cath Lab to receive the new state-of-the-art Toshiba equipment, ensuring full Department of Health compliance and approval. This was a design Build project with Mid-State Construction.

March 4, 2018

  • 1
  • 2
  • 3

Lancaster, PA

Murray Associates guided the transformation of the existing Cath Lab to receive the new state-of-the-art Toshiba equipment, ensuring full Department of Health compliance and approval. This was a design Build project with Mid-State Construction.

Our firm worked with the Hospital Physicist to verify the lead lined perimeter met the shielding requirements. The overhead support system was renovated to accommodate the suspended equipment; medical gas outlet relocations. The floors were trenched for the new cabling installations to the Control Room, Equipment Room planning and air conditioning. The floors were leveled for the tolerances of the new equipment. HVAC and lighting revisions and new floor, wall and ceiling finishes were complete throughout the lab.